# Modification and repair record

ARGYNIX Skills (worldskills.blog), lesson "Rework, repair and modification".
Our own template. One record for each change to a board. Keep it with the board and
give a copy with your report.

| Field | Entry |
|---|---|
| Record number | MOD-001 |
| Board, version, serial | |
| Date and time | |
| Done by | (name or competitor number) |
| Type | Rework / Repair / Modification (circle one) |
| Asked for by | (the brief, the trainer, the Expert, the design note) |

## Why

What is wrong, or what must change, in one or two sentences. Name the fault's evidence:
the measurement, the symptom, or the design error.

## What was done

Each step, in order, with the place on the board (reference designator, pin, net name).

1. 
2. 
3. 

| Part added or removed | Value | Package | Where |
|---|---|---|---|
| | | | |

Wire used (type, gauge, length), adhesive or coating used, and the board marking added
(for example "MOD A" next to the part).

## Test after the change

| Test | Expected | Measured | Pass |
|---|---|---|---|
| Continuity of the new connection | under 1 Ohm | | |
| No continuity across the cut | OL | | |
| Function | | | |

## Drawings updated

- [ ] Schematic marked up (red-line) and the change described in its notes.
- [ ] Layout or assembly drawing marked, if the board will be built again.
- [ ] BOM updated for parts added or removed.
